CO129-195 - Governor Hennessy - 1881 [1-4] — Page 110

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

109

that no

damage

has been caused

les the Lyphoon of yesterday, to

any portion of

the sea wall

recently rebuilt, nor to the ald

at

wall recently repaired, except

points opposite the Lugar Refinery, (Wanchai) where a junk was wrecked, and driven again

against the sea wall displacing 6 pieces of "Bull-nosed coping, and 6 or 7 feet length of the upper course of masonry, the cost of making good will be about $10.00

the damage,

the decomposed granite of which surface was formed, has

the Praya roadway

again

been washed

off in many places, the cost of

replacing

the decomposed granite, making good, reforming railing &c. I estimate approximately at from $200 to $400.

I have

(Signed) & Bundler

Making Surveys

General

Edit History

2026-05-22 17:42:02 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
109 that no damage has been caused les the Lyphoon of yesterday, to any portion of the sea wall recently rebuilt, nor to the ald at wall recently repaired, except points opposite the Lugar Refinery, (Wanchai) where a junk was wrecked, and driven again against the sea wall displacing 6 pieces of "Bull-nosed coping, and 6 or 7 feet length of the upper course of masonry, the cost of making good will be about $10.00 the damage, the decomposed granite of which surface was formed, has the Praya roadway again been washed off in many places, the cost of replacing the decomposed granite, making good, reforming railing &c. I estimate approximately at from $200 to $400. I have (Signed) & Bundler Making Surveys General
Baseline (Original)
109 that no damage has been caused les the Lyphoon of yesterday, to_ any portion of the sea wall recently rebuilt, nor to the ald at wall recently repaired, except points apposito the Lugar Refinery, (Wanchai) where a junk was wrecked, and driven again against the sea wall displacing 6 pieces of "Bull, nosed coping, and 6 or 7 feet Linesh of the upper course of masonry, the cost of making good will be about $10.00 the damags, the ow the decompresets granits of which surface of formed, hat the Praya roadway again been washed off in many places, the cost of replacing C replacing the decomposed granite, making goad, reforming railing a I estimate approximately at fram $200 to $400. I have se Le (Signed) & Bundler Making Surreys General
2026-05-22 17:42:02 · Baseline
View content

109

that no

damage

has been caused

les the Lyphoon of yesterday, to_

any portion of

the sea wall

recently rebuilt, nor to the ald

at

wall recently repaired, except

points apposito the Lugar Refinery, (Wanchai) where a junk was wrecked, and driven again

against the sea wall displacing 6 pieces of "Bull, nosed coping, and 6 or 7 feet Linesh of the upper course of masonry, the cost of making good will be about $10.00

the damags,

the ow

the decompresets granits of which

surface of

formed, hat

the Praya roadway

again

been washed

off in many places, the cost of

replacing

C

replacing the decomposed granite, making goad, reforming railing a I estimate approximately at fram $200 to $400.

I have

se

Le

(Signed) & Bundler

Making Surreys

General

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.